Home Installation Guide Traning manual Stages of Installing a GRP Roof

Stages of Installing a GRP Roof

The installation of a GRP roof can be divided into 4 stages:

1. Preparing and decking the roof.

The old roof covering is removed if necessary and the roof is re-decked with OSB3 18mm tongue and groove boards.

Preparing and decking the roof

2. Fixing the edge trims.

GRP edge trims are fixed to the perimeter of the roof and can be used to adapt the laminate to almost any specification.

Fixing the edge trims

3. Laminating

 

Joints between decking, gutters, GRP trims and protrusions ;e.g. rooflights are bandaged at this point. The entire roof is then laminated with a layer of GRP.

 

Laminating

4. Topcoating and finishing.

 

The roof is then topcoated, with the client’s specification of colour and finish.

 

Topcoating and finishing

purchase brand viagra online - viagra